Difference between revisions of "Proposed Calendar"
Line 2: | Line 2: | ||
− | July 5 schema (machine configuration) | + | '''July 5''' schema (machine configuration) |
− | July 19 version 2.0 | + | '''July 19''' version 2.0 |
• revised machine configuration | • revised machine configuration | ||
Line 15: | Line 15: | ||
− | August 2 version 3.0 | + | '''August 2''' version 3.0 |
upper division classes described in more depth | upper division classes described in more depth | ||
− | August 16 version 4.0 | + | '''August 16''' version 4.0 |
• core defined in more detail | • core defined in more detail | ||
Line 29: | Line 29: | ||
− | August 30 version 5.0 | + | '''August 30''' version 5.0 |
•revision plan articulated in a "framing" document | •revision plan articulated in a "framing" document | ||
Line 39: | Line 39: | ||
− | September 13: write up documents, edit | + | '''September 13:''' write up documents, edit |
− | September 27: | + | '''September 27: fi'''nal edit, documents ready |
− | October 1: DEADLINE | + | '''October 1: DEADLINE''' |
Latest revision as of 06:36, 7 July 2006
Proposed Calendar
July 5 schema (machine configuration)
July 19 version 2.0
• revised machine configuration
a) core = 2nd year core (rough descriptions, paragraph) classes &
b) first approximation for individual concentrations at upper division, (bulleted list)
August 2 version 3.0
upper division classes described in more depth
August 16 version 4.0
• core defined in more detail
• articulation
• define opportunities to extend the reach and significance of SIAT at SFU
August 30 version 5.0
•revision plan articulated in a "framing" document
•individual course descriptions
(test the curriculum with faculty, put to bureaucratic test, advising test)
September 13: write up documents, edit
September 27: final edit, documents ready
October 1: DEADLINE