Difference between revisions of "Proposed Calendar"

From ucrack
Jump to navigation Jump to search
 
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
 
'''Proposed Calendar'''
 
'''Proposed Calendar'''
  
July 5  schema (machine configuration)
 
  
July 19 version 2.0
+
'''July 5'''  schema (machine configuration)
 +
 
 +
 
 +
'''July 19''' version 2.0
  
 
• revised machine configuration
 
• revised machine configuration
Line 13: Line 15:
 
            
 
            
  
August 2 version 3.0
+
'''August 2''' version 3.0
 
              
 
              
 
upper division classes described in more depth
 
upper division classes described in more depth
  
  
August 16 version 4.0
+
'''August 16''' version 4.0
 
              
 
              
 
• core defined in more detail
 
• core defined in more detail
Line 27: Line 29:
  
  
August 30 version 5.0
+
'''August 30''' version 5.0
  
 
•revision plan articulated in a "framing" document
 
•revision plan articulated in a "framing" document
Line 37: Line 39:
  
  
September 13: write up documents, edit
+
'''September 13:''' write up documents, edit
  
  
September 27: final edit, documents ready
+
'''September 27: fi'''nal edit, documents ready
  
  
October 1: DEADLINE
+
'''October 1: DEADLINE'''

Latest revision as of 06:36, 7 July 2006

Proposed Calendar


July 5 schema (machine configuration)


July 19 version 2.0

• revised machine configuration

a) core = 2nd year core (rough descriptions, paragraph) classes &

b) first approximation for individual concentrations at upper division, (bulleted list)


August 2 version 3.0

upper division classes described in more depth


August 16 version 4.0

• core defined in more detail

• articulation

• define opportunities to extend the reach and significance of SIAT at SFU


August 30 version 5.0

•revision plan articulated in a "framing" document

•individual course descriptions

(test the curriculum with faculty, put to bureaucratic test, advising test)


September 13: write up documents, edit


September 27: final edit, documents ready


October 1: DEADLINE